• Consumer Affairs
  • Corporate Citizen
  • Spectrum Online Center
  • Wiremen Login
  • About Us
  • Legal
  • Sectors
    • Electricity
    • Telecommunications
    • Water
  • Decision
  • Publications
  • Proceedings
  • Consumer Affairs
  • Corporate Citizen
  • Spectrum Online Center
  • Wiremen Login
  • Contact

2021 BEL ARP Initial Decision

Post Views: 2,298

In exercise of the powers conferred upon it by the Public Utilities Commission Act, Chapter 223 of the Laws of Belize, the Electricity Act, Chapter 221 of the Laws of Belize, the Electricity (Tariffs, Fees and Charges) By-laws, and all other powers thereunto enabling, the Public Utilities Commission (PUC; the Commission) hereby notifies the general public that on June 24, 2021, it made the 2021 Annual Review Proceeding Final Decision (hereinafter referred to as “the Final Decision”) for the Belize Electricity Limited (BEL; the Licensee).
Summary of the Final Decision:

  1. The Commission approved various adjustments to Cost of Power, Regulated Asset Value (RAV) and other Regulated Values approved for the remainder of the Full Tariff Period of July 1, 2021 to June 30, 2024. There has been no adjustment to any other previously approved Fees and Charges.
  2. The Commission reassessed the Mean Electricity Rate (MER) at $0.3999 per kilowatt-hour resulting in a reduction in the rates payable by consumers. The reassessed MER of $0.3999 per kilowatt-hour represents a decrease in the MER from the previously approved $0.4018 per kilowatt-hour in the 2020 FTRP Final Decision.
  3. The Commission approved the following Tariffs to be applied for the Annual Tariff Period (ATP) of July 1, 2021, to June 30, 2022.
Public Notice -2021 BEL ARP Initial DecisionDownload
Previous Post
Final Draft Utility Procurement Regulation
Next Post
FINAL DECISION – BEL Annual Review Proceeding 2021

Recent Publication

  • Public Notice – Extended Consultation Period on Proposed Electricity Regulations of 2026
  • Summary of Responses – Consultation on Proposal to Repeal and Replace Electricity Licensing and Consent Regulations of 2026
  • PUBLIC NOTICE: BEL Submits 2026 Annual Review Proceedings Proposal to the PUC
  • BEL Annual Review Proceedings Submission – April 2, 2026
  • PRESS RELEASE: PUC Hosts Regulatory Innovation Workshop in Collaboration with ITU
  • PUBLIC NOTICE: PUC Proposes to Update National Spectrum Allocation Plan
  • Proposed Belize National Spectrum Allocation Plan
  • PUC Proposes to Grant Electricity Licence to Hydro Maya Limited
Public Utility Commission
Public Utility Commission
Public Utility Commission
Public Utility Commission
Public Utility Commission
Electricity
Water Sector
Telecom
Electricity
Water Sector

Call us today at +501-223-4938
or email us at info@puc.bz

Contact us

The purpose of the Public Utilities Commission is to regulate the electricity, water, and telecommunications sectors in Belize to efficiently provide the highest quality services at affordable rates, ensuring the viability and sustainability of each sector.

CONTACT INFORMATION

2nd Floor, Marina Towers, New Town Barracks, Belize City, Belize

(+501) 223-4938

info@puc.bz

QUICK LINK

  • File A Complaint
  • Current Activities
  • Appeals Process
  • Government of Belize
  • Ministry of Natural Resources and the Envirornment

Copyright © 2021 – 2023 by The Public Utilities Commissions     |     Created by TAS Belize Website Design & Digital Agency