BWS Tariff Review and Business Plan 2020-2025

Post Views: 7,569

Executive Summary

Overview

Belize Water Service Limited (BWS) tariff and miscellaneous fees are reviewed and approved by the Public Utilities Commission (PUC) through a tariff review process. The PUC regulatory process includes a five-year review period referred to as a Full Tariff Period (FTP). The first FTP under the current PUC license was for the period ending March 31, 2010. This initial period is referred to as the “First FTP” period. The Second FTP includes the period between April 1, 2010 and March 31, 2015. The existing or Third FTP includes the period between April 1, 2015, and March 31, 2020. The business plan herein addresses the Fourth FTP which is projected to span from April 1, 2020, through March 31, 2025 (FFBP).
BWS operates on a fiscal year (FY) basis starting each year April 1 and ending March 31. As of the date of this report, BWS is operating within FY 2019/20. The business plan includes a financial model and projections based on planned future financial results. The financial analysis relies on recent Financial Statements and Independent Auditor’s reports, the FY 2019/20 budget, and other recent information to form the starting point, and then forecasts key financial and operational elements to develop the full five-year forecast from FY 2020/21 through FY 2024/25.

Proposed Tariff Structure

No tariff increase is proposed during the first two years of the FFBP, but an adjustment in the tariff is proposed. Important objectives identified in the tariff design include i) simplifying the consumption block for residential and non-residential customers; ii) maintaining the 1,000-gallon minimum for all customers; iii) evaluating a fixed minimum charge by meter size for non-residential customers; and iv) affordability.

BWS-4th-FTP-Application-to-PUC-01October2019 – Business Plan 20-25Download
Previous Post
Final Decision – BEL 2019 ARP
Next Post
Belize Radio Frequency Channelization for Point-to-Point Links

Recent Publication

  • PUBLIC NOTICE: PUC Proposes to Grant Electricity Licence for Distributed Generation
  • PUBLIC NOTICE: PUC Issues Final Decision on BWSL 2026-2031 Full Tariff Review Proceeding
  • PUC Final Decision: 2026-2031 Full Tariff Review Proceeding for Belize Water Services Limited
  • PUBLIC NOTICE: Public Consultation on Assessment of Dominance in Telecommunications Markets
  • PUBLIC CONSULTATION: Initial Determination on Market Dominance
  • BEL, in Partnership with the Government of Belize and the IFC, Launches 80 MW Utility-Scale Solar Project Development 
  • PUC Customer Complaint and Dispute Process
  • PUBLIC NOTICE – PUC Approves Amendment to BEL’s ARP 2025 Final Decision
Public Utility Commission
Public Utility Commission
Public Utility Commission
Public Utility Commission
Public Utility Commission
Electricity
Water Sector
Telecom
Electricity
Water Sector

Call us today at +501-223-4938
or email us at info@puc.bz

Contact us

The purpose of the Public Utilities Commission is to regulate the electricity, water, and telecommunications sectors in Belize to efficiently provide the highest quality services at affordable rates, ensuring the viability and sustainability of each sector.

CONTACT INFORMATION

2nd Floor, Marina Towers, New Town Barracks, Belize City, Belize

(+501) 223-4938

info@puc.bz

QUICK LINK

  • File A Complaint
  • Current Activities
  • Appeals Process
  • Government of Belize
  • Ministry of Natural Resources and the Envirornment

Copyright © 2021 – 2023 by The Public Utilities Commissions     |     Created by TAS Belize Website Design & Digital Agency